24 HOUR SERVICE
CHARLOTTE: 704.372.2828 RALEIGH: 919.790.2990

OUR WORK

Capitol Tower South

The South Office Tower was designed and constructed during Phase I as a 10 story shell building, accompanied by a 7 story parking garage.  It was designed and installed By Mechanical Contractors, Inc.

The HVAC system consists of a Self Contained Water cooled air conditioning unit on each floor and a roof-mounted cooling tower and pumps to circulate condenser water to all floors.  There is also a closed loop condenser water system installed to allow the tenants to install dedicated equipment as necessary for individual needs.  The BMS system is a web-based controls system that allows the building to operate at maximum efficiency at all times of the day and provides the owner the ability to make any necessary changes as needed.

 

Department Details:
  • Construction
  • Engineering
  • Management
  • Efficiency
  • Controls
  • Services
Let’s Connect!
MCI can help you plan, construct, maintain and manage any mechanical system in your building. All you have to do is click this button.
Contact Us
Project Specs:
HVAC Demographics
  • Variable Air Volume (VAV) system with a medium pressure ductwork loop on each floor.
  • 10 Water Cooled Self Contained (WCSC) Air Handling Units per building
  • 510 Total Tonnage
  • Tridium WebBased Controls System
Energy Conservation Measures
  • Demand Control Ventilation– CO2 OA Control
  • Water-Side Economizers
  • Variable Speed Condenser Water Pumping
  • Critical Zone Pressure Reset
  • Cooling Tower Fans– Variable Speed
  • 12 degree Cooling Tower temperature difference
Building Specifications
  • 236,250 Square Feet
  • 10 Floors
  • Parking Deck
  • Commercial Construction
Certifications
  • LEED Gold
Return To Our Work