24 HOUR SERVICE
CHARLOTTE: 704.372.2828 RALEIGH: 919.790.2990

OUR WORK

MCI provided HVAC systems installation for AptarGroup, Inc. for their new 317,834 SF facility in Lincolnton, NC.  Aptar manufactures spray and lotion pumps, dispensing closures, and aerosol valves for the global beauty, personal care, pharmaceutical, household, food and beverage markets. Some construction projects present challenges for project management that make the use of regular cranes not possible or cost effective.  Due to the size and height of the Aptar facility, a helicopter was utilized to set all the RTUs. With a helicopter, there is no set up time and the equipment can be set much faster keeping the schedule and budget in line.

PROJECT HIGHLIGHTS

  • 28 rooftop units set by helicopter
  • 19 VAV zones in the office area
  • Controls provided by MCI

Department Details:
  • Construction
  • Engineering
  • Management
  • Efficiency
  • Controls
  • Services
Let’s Connect!
MCI can help you plan, construct, maintain and manage any mechanical system in your building. All you have to do is click this button.
Contact Us
Project Specs:
Return To Our Work